Loft insulation

Loft insulation, laid to full depth in a day

Two layers, between and across the joists, to the depth that’s commonly recommended. Measured first and quoted in writing. Get your free quote.

  • Free written quote
  • Measured first
  • Every part priced
  • Usually done in a day

Illustration: a loft insulated between and over the joists

About this service

We lay the first layer between the ceiling joists and a second across them, so the floor of the loft is evenly covered to full depth. Eaves kept clear, pipes and tank lagged, cables on top, hatch insulated.

What’s included

  • Loft measured and checked before we start
  • First layer between the joists
  • Second layer across the joists
  • Eaves trays so air keeps moving
  • Pipes and tank lagged, cables lifted on top
  • Hatch insulated and draught-sealed

We price the job after looking at your loft. You get a written quotation before any work is agreed.

Two layers, laid crossways

Joists are usually around 100 mm deep, so one layer between them is never enough on its own. The second layer goes at right angles across the top, covering the timber and bringing the whole loft floor up to depth. For mineral wool, around 270 mm in total is what’s commonly recommended.

The bits that get missed

Insulation pushed into the eaves stops air moving under the roof, so we fit trays to hold it back. Pipes and the tank sit in a colder loft afterwards, so they’re lagged. Cables are lifted to sit on top. And the hatch is insulated and sealed, because it’s a hole in the middle of everything else.

Want storage too?

Boards laid straight on the joists squash insulation flat. If you want to keep using the loft, we’ll quote for a raised floor on legs at the same time.

The process

How it works

  1. Send your details

    Postcode, what you’d like done and the type of house. About a minute.

  2. We measure up

    Insulation depth, joists, access, eaves and anything already in the loft.

  3. Every part priced

    A written quote that lists each part of the job and its price.

  4. Done, usually in a day

    If you go ahead, we agree a date, do the work and take the waste away.

Loft insulation: your questions answered

How deep will it be?
For mineral wool, around 270 mm is commonly recommended. Your quote says the depth we’ll lay.
How long does it take?
Most lofts are done in a day.
Do I need to empty the loft?
The floor needs to be clear. We can clear it for you if you tell us on the form.
Can I still use the loft for storage?
Yes, with a raised floor above the insulation.
Is it guaranteed?
Eligible installations come with a guarantee of up to 5 years. Your written quote says whether your job qualifies and what it covers.

Full depth below. Room to store above. Get a price.

Tell us about your loft and we’ll quote the insulation, boarding and ladder in writing. Free, no obligation.

Get my quote
Get my free quote